Skip to content
  • There are no suggestions because the search field is empty.

What must be mounted and checked on an Advansor rack before commissioning?

Requirements vary depending on the specific rack model and any optional functions.

For a typical booster system with two suction groups, gas cooler sensors must be mounted and verified, alongside the gas cooler fan fault signals and fan speed regulation controls.